Defford-Cum-Besford School

Project Information

Location

Defford-Cum-Besford School

Project

Temporary Building

Contract Duration

10 weeks

Project Overview

We delivered a high-quality, fully insulated temporary classroom building, designed for year-round use. This modular timber frame structure was constructed to meet educational needs quickly, efficiently, and within budget.

✅ Why a Temporary Classroom?

The client needed additional learning space to accommodate student growth without committing to permanent infrastructure. This solution provided:

  • Fast-track installation
  • Sustainable materials
  • Full compliance with educational building standards
  • High levels of insulation and comfort

🏗️ Phase 1: Demolition and Groundworks

Our team began with site clearance and ground preparation, ensuring a solid and level base for the modular classroom.

Demolition works included:

  • Removing old sheds and existing concrete base
  • Excavating and removing excess topsoil

Groundwork included:

  • Installation of 300mm MOT Type 1 base
  • Concrete slab with shuttering and visqueen membrane

🏠 Phase 2: Temporary Classroom Construction

We used a timber frame construction system, offering speed, flexibility, and cost-effectiveness — ideal for educational environments.

Key Features of the Classroom Build

✅ Timber Floor System

  • 300mm floor construction with insulation and moisture-resistant chipboard
  • Visqueen membrane and vapour barrier protection

✅ External Timber Walls

  • Douglas Fir rain screen cladding
  • Rockwool insulation
  • 12.5mm plasterboard and OSB board finish

✅ Flat Roof Construction

  • OSB roof decking
  • Full insulation layer
  • High-performance felt roof covering

✅ Doors & Windows

  • UPVC casement windows
  • External and internal doors with ironmongery

✅ Interior Fit-Out

  • Internal stud partitions
  • Skirting and architraves
  • Carpet tiles and SureStep vinyl flooring
  • Plasterboard ceilings
  • Full decoration works

✅ Sanitary & WC Installations

  • Sanitary ware, vanity units, and cubicles
  • Plumbing and pipework
  • Framework and vanity installations

✅ Drainage & External Works

  • Excavation and installation of underground drainage
  • Pipework and backfill
  • Tarmac reinstatement and site make-good

🔨 Construction Materials Used

  • Timber frame construction for walls, floor, and roof
  • Douglas Fir external cladding
  • Rockwool insulation for thermal and acoustic performance
  • OSB and chipboard structural elements
  • Visqueen and Tyvek membranes for moisture and vapour control
  • UPVC windows and guttering
  • Felt roofing system

📈 Outcome

The result is a fully insulated, durable temporary classroom that meets educational requirements, providing students and teachers with a high-quality learning environment — delivered efficiently and with minimal disruption. We are also experts in school toilet refurbishment, creating bespoke solutions to fit your needs. Contact us today to find out how we can help you.