St Benedict’s School

Project Information

Location

St Benedict’s, Alcester

Project

Washroom refurbishment

Contract Duration

2 weeks

Brief Description

  • Isolate existing electrics and
  • Remove existing cubicles, WC’s, Wash Hand Basin’s, hand dryer, lighting, cleaners sink, wall tiles and radiator.
  • Refix existing radiator
  • Supply and install new cubicles
  • Construct stud framework ready for duct panelling
  • Supply and install duct panelling
  • Supply and install 3no WC’s
  • Supply and install coved skirting to perimeter for vinyl to lay over
  • Extend half height wall to full height
  • Prepare floor with latex ready for new vinyl flooring
  • Supply and install new vinyl flooring
  • Supply and install new LED lighting on PIR sensors
  • Plaster walls and supply and install whiterock cladding to walls @ 1.2m high
  • Supply and install wash trough with non-concussive taps & brackets
  • Supply and install new cleaners sink with non-concussive taps and legs
  • Construct new storeroom
  • Supply and install door to storeroom
  • Supply and install storeroom lighting
  • Silicon sealing to joints
  • Decorations to joinery and walls
  • Supply and install new hand-dryer
BeforeAfter
BeforeAfter

How can we be of assistance?

Contact us today to see how we can help deliver your vision with a comprehensive service from design consultation to end result.

Enquire Now or Call 0121 474 5136