Fr Hudson’s

Project Information

Location

Fr Hudson’s, Coleshill

Project

Conversion of existing dwelling into 2 flats

Contract Duration

11 weeks

Brief Description

  • Carry out licensed asbestos removal works and provide completion certificates and air testing certification.
  • FULL strip out of existing dwelling
  • Form new structural openings for new doors
  • Break out existing walls to Flats 1 + 2 Shared Bathroom
  • Protect existing staircase floor and wall finishes and balustrading throughout the works
  • Install new Fire Detection system.
  • Install roof insulation to 300mm thick Rockwool.

Staff Office & hall

  • Install new Floor Finish
  • Install new internal partition wall to form wall to new Flat 2 En-Suite
  • Existing masonry walls to be re-skimmed and finished
  • Provide new gas boiler and thermostat within wall-mounted cupboard.
  • Install new electrical services.
  • Install new electrical distribution board

FLAT 1 and 2 Bedroom

  • Install new floor
  • Install new internal partition wall to infill wall to existing Hall
  • Existing masonry walls to be re-skimmed and finished.
  • Install new door to Hall.
  • Install new sliding door to Flat 1 En-Suite, within SW timber stud pocket wall.
  • Install new mechanical and electrical services
  • Install new radiator and associated pipework.
  • Install new patio door (Flat 2).

FLAT 1 and 2 Living / Kitchen / Dining

  • Install new floor.
  • Install new internal partition wall to part-infill opening to Flat 2 Bedroom
  • Existing masonry walls to be re-skimmed and finished.
  • Install new sliding door to Bedroom.
  • Install new door to Hall.
  • Install new window / door arrangement.
  • Install new kitchen fittings, white goods, and equipment.
  • New masonry wall infill to fireplace.
  • Install new mechanical and electrical services.
  • Install new standard radiator and associated pipework.
  • Supply and fit all kitchen fittings

 

FLAT 1 and 2 En-Suite

  • Install new floor
  • Install new floor to shower area
  • Install new internal partition wall to form wall to new Visitor’s WC.
  • Install new hot and cold water services.
  • Install new below ground drainage to connect back to existing.
  • Install new mechanical and electrical services.
  • Install new radiator, associated pipework and towel rail.
  • Fit obscured glazing into existing windows
  • Supply and install vanity unit with slab basin, basin mixer, flipper waste, towel ring and floor gulley.

Visitor’s WC

  • Install new Floor Finish Type 2, scheduled elsewhere.
  • Install new below ground drainage to connect back to existing.

How can we be of assistance?

Contact us today to see how we can help deliver your vision with a comprehensive service from design consultation to end result.

Enquire Now or Call 0121 474 5136