Defford-Cum-Besford School

Project Information

Location

Defford-Cum-Besford School

Project

Temporary Building

Contract Duration

10 weeks

Project Overview

We delivered a high-quality, fully insulated temporary classroom building, designed for year-round use. This modular timber frame structure was constructed to meet educational needs quickly, efficiently, and within budget.

✅ Why a Temporary Classroom?

The client needed additional learning space to accommodate student growth without committing to permanent infrastructure. This solution provided:

  • Fast-track installation
  • Sustainable materials
  • Full compliance with educational building standards
  • High levels of insulation and comfort

🏗️ Phase 1: Demolition and Groundworks

Our team began with site clearance and ground preparation, ensuring a solid and level base for the modular classroom.

Demolition works included:

  • Removing old sheds and existing concrete base
  • Excavating and removing excess topsoil

Groundwork included:

  • Installation of 300mm MOT Type 1 base
  • Concrete slab with shuttering and visqueen membrane

🏠 Phase 2: Temporary Classroom Construction

We used a timber frame construction system, offering speed, flexibility, and cost-effectiveness — ideal for educational environments.

Key Features of the Classroom Build

✅ Timber Floor System

  • 300mm floor construction with insulation and moisture-resistant chipboard
  • Visqueen membrane and vapour barrier protection

✅ External Timber Walls

  • Douglas Fir rain screen cladding
  • Rockwool insulation
  • 12.5mm plasterboard and OSB board finish

✅ Flat Roof Construction

  • OSB roof decking
  • Full insulation layer
  • High-performance felt roof covering

✅ Doors & Windows

  • UPVC casement windows
  • External and internal doors with ironmongery

✅ Interior Fit-Out

  • Internal stud partitions
  • Skirting and architraves
  • Carpet tiles and SureStep vinyl flooring
  • Plasterboard ceilings
  • Full decoration works

✅ Sanitary & WC Installations

  • Sanitary ware, vanity units, and cubicles
  • Plumbing and pipework
  • Framework and vanity installations

✅ Drainage & External Works

  • Excavation and installation of underground drainage
  • Pipework and backfill
  • Tarmac reinstatement and site make-good

🔨 Construction Materials Used

  • Timber frame construction for walls, floor, and roof
  • Douglas Fir external cladding
  • Rockwool insulation for thermal and acoustic performance
  • OSB and chipboard structural elements
  • Visqueen and Tyvek membranes for moisture and vapour control
  • UPVC windows and guttering
  • Felt roofing system

📈 Outcome

The result is a fully insulated, durable temporary classroom that meets educational requirements, providing students and teachers with a high-quality learning environment — delivered efficiently and with minimal disruption.