Bordesley Green Girls’ School

Project Information

Location

Bordesley Green Girls’ School, Bordesley Green

Project

Washroom Refurbishment

Contract Duration

6 weeks

📍Project Overview

We were appointed to deliver a full refurbishment of the washroom facilities at a local school, encompassing two large sets of girls’ toilets, the lobby area, and a disabled WC. The project aimed to modernise the facilities, improve hygiene, durability, and accessibility, and enhance the overall environment for students and staff.

🛠️ Scope of Works

Areas Refurbished:

  • Girls’ Toilets 01

  • Girls’ Toilets 02

  • Lobby

  • Disabled Toilet


Girls’ Toilets – Locations 01 & 02

🧱 Key Works Undertaken

  • Complete strip-out of existing cubicles, vanity units, sanitary ware, duct panelling, dispensers, and flooring.

  • Retained existing quarry tiles where possible, levelling with latex screed for new flooring.

  • Installed new cubicles (8 in Girls 01 and 14 in Girls 02).

  • Supplied and installed solid surface vanity units with washtroughs for durability and hygiene.

  • Fitted new sanitary ware including 22 WCs and 14 non-concussive taps across both areas.

  • Installed Bioclad hygienic wall cladding for long-term cleanliness and moisture resistance.

  • Added vinyl safety flooring, cap and cove skirting, and privacy film to windows.

  • Electrical upgrades included hand dryers and extract ventilation.

  • Replaced and decorated exposed joinery, new mirrors, and updated ironmongery and door sets.


♿ Disabled Toilet

💡 Focused on Accessibility

The disabled washroom was refurbished in accordance with Doc M compliance:

  • Full strip-out of outdated sanitary ware and finishes.

  • Installed a complete Doc M sanitary pack, including support rails and accessible WC.

  • New vinyl flooring, cap and cove skirting, Bioclad wall cladding, and sanitary sealing.

  • Upgraded hand dryer, tested existing disabled alarm system, and installed new mirrors.


🚪 Lobby

🧼 Compact but Complete

The lobby area was updated and given a face lift:

  • Installed new oak veneer fire-rated doors and a plywood-faced service door, complete with ironmongery.

  • New flooring, wall finishes, and emulsion decoration.

  • Works included clean and clear on completion to ensure a ready-to-use facility.


✅ Project Outcomes

  • Modern, clean, and bright facilities across all washroom areas.

  • 🧼 Improved hygiene and maintenance through durable, easy-clean surfaces and touchless fittings.

  • Accessibility enhancements with a compliant disabled toilet.

  • 💡 Energy-efficient upgrades with modern hand dryers and ventilation.

  • 🏫 A much more pleasant and practical space for students and staff alike.

Looking to upgrade your school facilities?

Contact us to discuss how we can help modernise your washrooms or learning environments.

How can we be of assistance?

Contact us today to see how we can help deliver your vision with a comprehensive service from design consultation to end result.

Enquire Now or Call 0121 474 5136