Residential property, Quinton

Project Information

Location

Quinton, Birmingham

Project

Rear Garden

Contract Duration

3 week

Brief Description

  • Remove and dispose existing garage electrical system
  • Demolition and dispose of existing concrete double garage
  • Remove asbestos corrugated roof in accordance with the Control of Asbestos Regulations
  • Break out and dispose of existing garage concrete floor
  • Prepare concrete base for new single garage
  • Provide and install new single garage
  • Install new electrical and lighting system
  • Remove existing perimeter fencing
  • Supply and install new wooden panel to sides and read of the property boundary
  • Supply and install composite decking
  • Supply and install cat run

How can we be of assistance?

Contact us today to see how we can help deliver your vision with a comprehensive service from design consultation to end result.

Enquire Now or Call 0121 474 5136