news

16 Aug 2017 - Job Vacancy - Estimator / Quantity Surveyor

We are looking for an Estimator / QS to join our team.

http://job-openings.monster.co.uk/Estimator-Quantity-Surveyor-Birmingham-MID-UK-Zone-CEE-Ltd/11/187279937?MESCOID=1300080001001&jobPosition=2

Heartlands Hospital " Neo Natal Unit

11 Aug 2017 - Heartlands Hospital " Neo Natal Unit

In conjunction with Mike Tippins Design, this project undertook to create new office spaces for support staff and nurses and ultimately concluded with a refurbished space for neo-natal care within the Delivery Suite. Fittings included work stations for nurses and the Trusts specified furniture for storage of medical equipment. Electrical installations nurse call points and specialist lighting, and a new hand wash point was plumbed and installed. The works were phased according to the Trust’s requirements and negative pressure was ensured within the rooms at all times due to the sensitive environment. Works were undertaken with due consideration to patients, staff and ongoing operations of the unit at all phases.

Holbrook House, Swindon

10 Aug 2017 - Holbrook House, Swindon

We recently finished a complete turnkey refurbishment of the 2nd floor offices (7,000sq ft). The project took 8 weeks, with a value of £264k and included: new suspended ceiling; new flooring; comfort cooling; LED and small power system using underfloor buzz bar in raised access floor. We also refurbished the common areas, male and female toilets and the lift lobby.

Science Laboratory - Aston Manor Academy

06 Apr 2017 - Science Laboratory - Aston Manor Academy

We have recently finished refurbishing 2 science rooms at Aston Manor Academy in conjunction with Havelock Europa. Providing all new fitted furniture along with full mechanical and electrical installation as part of a turn key project.

Longwill School for Deaf Children

02 Nov 2016 - Longwill School for Deaf Children

Our recently completed project at Longwill School included knocking through an existing wall and creating a bespoke split level reception hatch, along with refurbishing the reception office. We also refurbished an additional office and replaced all the doors in the School with solid wood veneer doors including VPs.

Aston Manor Academy - Sports Hall Changing Room Refurbishment

08 Aug 2016 - Aston Manor Academy - Sports Hall Changing Room Refurbishment

This project comprised of the refurbishment of the; male and female changing rooms; the male, female and DDA toilet; the entrance lobby; stairwell and fitness suite. Amwell Washrooms ‘splash’ SGL cubicles and benching were fitted along with Altro Whiterock wall cladding and Gerflor Tarasafe Ultra H2O vinyl.

Ninestiles Academy - Resource Centre / Library

17 Jun 2016 - Ninestiles Academy - Resource Centre / Library

This project involved the conversion of changing facilities and hall into a Resource Centre / Library, which included the installation of a mezzanine floor with access via two new staircases.

This was a 6 month project where we worked closely with the academy and architect to overcome various structural challenges and ensured that the existing 1930's architectural features were maintained. The project was located in the middle of the Academy, with limited access and restricted hours, to ensure pupils weren't disturbed at this high achieving Academy.

Market Bosworth High School - Undercroft Classroom

05 Nov 2015 - Market Bosworth High School - Undercroft Classroom

In order to maximise teaching space at this innovative School, we were ask to convert the undercroft into a classroom, in conjunction with Surveyors to Education (S2e). In this design and build project we created openings in the front elevation to allow for access. The undercroft was excavated of soil and a floor slab cast. New supporting steel work was installed (see photo). The room was then fitted out to classroom standard including full mechanical and electrical works with low energy lighting via LED lights. The project was undertaken during the 6 week Summer holidays.

Kings Norton Boys School

12 Oct 2015 - Kings Norton Boys School

During the summer we refurbished two large toilet areas within the School, which included the remodelling of one toilet area. The cubicles were from Venesta Washrooms Award range, WC duct panelling was installed along with fully recessed vanity units. A new suspended ceiling was fitted with recessed LED lighting. The walls were fully tiles and floors laid with vinyl from Tarasafe Ultra range from Gerflor.

Severne Primary School - KS1 Veranda refurbishment

05 Oct 2015 - Severne Primary School - KS1 Veranda refurbishment

We were delighted to be asked to refurbished the KS1 Veranda. We provided low level bespoke benching at either end of the 28m room for KS1 pupils, including an area for ICT as well as general teaching. The mid-section incorporated 9 meters of bespoke floor to ceiling storage cupboards and 2 adult height sink units. The brickwork walls were finished with Ilumitex wall covering and the flooring was divided into sections of vinyl, barrier matting and, carpet tiles from Interface FLOR Series 1.

King Edward VI High School for Girls

28 Sep 2015 - King Edward VI High School for Girls

This prestigious School chose Centurion solid grade cubicles from Venesta Washrooms along with solid surface pre-plumbed vanity units, for the recent refurbishment of their toilets. The walls were fully covered with Altro Whiterock in Cesco and Viola, the purple theme then continued onto the floor in the form of Tarkett Safetred Spectrum in Purple. PIR lights, sensor wc flush and sensor taps were fitted along with Sterrilo Hand Dryers. The 8 sets toilets were complete during the 6 week Summer holidays.

Birmingham Businss Charter for Social Responsibility

03 Aug 2015 - Birmingham Businss Charter for Social Responsibility

We are delighted to announce that we have been awarded 'The Birmingham Business Charter for Social Responsibility'.

This award recognises companies who have acknowledged the importance of corporate social responsibility, and have committed through an accredited action plan to help improve the economic, social and environmental well-being of Birmingham's citizens and are actively demonstrating that these values are embedded into the heart of their businesses.

Walmley Junior School - Craft Room

07 May 2015 - Walmley Junior School - Craft Room

Working in conjunction with Construction Management Services, our brief was to strip out an IT Classroom and convert it along with another room to provide facilities for lessons in Cooking and Art. Kitchen units and new appliances were installed along with new Trespa topped desks (not shown). Air conditioning was installed along with a new suspended ceiling.

The distinctive flooring we installed was from Polyflor Expona Commercial in Dark Recycled Wood.

3663 Swansea Depot Refurbishment

23 Dec 2014 - 3663 Swansea Depot Refurbishment

We were thrilled to work with Bidvest 3663 during the refurbishment of their Swansea depot. The almost 400 metres squared depot was stripped back to it's structural frame, re-roofed and clad. After the installation of a new raised floor, we worked in conjunction with Fen-Bay Services to fit out the depot with bespoke access doors and lorry charging points.

Oscott Manor School - New Conservatory

09 Dec 2014 - Oscott Manor School - New Conservatory

We have just completed extending a classroom with a new Conservatory area to provide an increased teaching area within the School. The floor was fitted with Flotex by Forbo.

Westminster Primary School - Staff Room

23 Sep 2014 - Westminster Primary School - Staff Room

It was a pleasure to continue the Head Teachers vision from the KS1 Staff Room into the Main Staff Room at the School. Beech gloss kitchen units were fitted with black mirror worktops. Various seating areas were created, for eating, working or just relaxing. Storage cupboards were created in Beech Veneer.

The Oval Primary School - Nursery

23 Sep 2014 - The Oval Primary School - Nursery

During the Summer we complete a range of works within the Nursery area of the School including, the remodelling of pupil toilets to create two new toilet areas and a small teaching area. The toilets were fitted with Profile Cubicles from Bushboard Washrooms.

In addition we created two new classroom entrances, one an internal archway to the corridor, the other removing a window to create a new door entrance to the play ground. Further new internal and external doors were fitted and new low level fencing was installed in the playground.

Balsall Common Primary School

15 Sep 2014 - Balsall Common Primary School

It was a pleasure to complete these bright sunshine toilets at Balsall Common Primary School. The School continued with the Award range from Venesta Washrooms in solid grade laminate for their latest pair of refurbishments.

Severne Primary School - Ladies Staff Toilets

15 Sep 2014 - Severne Primary School - Ladies Staff Toilets

We were delighted to be asked to undertake a full refurbishment of the Ladies Staff toilet at Severne Primary School. We used the Award Cubicle Range from Venesta Washrooms in HPL in the colours Teal and Eucalyptus.

Anglesey Infant School - Toilet Refurbishment

15 Sep 2014 - Anglesey Infant School - Toilet Refurbishment

This Summer we complete the final 3 toilet refurbishments on the Infant School School site. The School had chosen to use the Profiles range from Bushboard Washrooms, in Solid Grade Laminate.

Westminster Primary School - KS1 Staff Room Refurbishment

24 Jul 2014 - Westminster Primary School - KS1 Staff Room Refurbishment

Last term we complete the refurbishment of the Staff Room, including a new Beech Gloss Kitchen and storage in the form of floor to ceiling cupboards along one wall. The corporate colours will be continued into the Senior Management Corridor and KS2 Staffroom. In addition to the staff room we also refurbished the adjacent toilets, landing and stairs.

Dudley College - Catering Kitchen

09 Apr 2014 - Dudley College - Catering Kitchen

We recently extended and converted an existing classroom within the College which didn't have any services, into a 140m2 Training Kitchen for Catering Students. All the services had to be extended and hidden within the building fabric. The walls were finished in Altro Whiterock, with the stainless steel equipment supplied and fitted by Francis Catering.

The Martin High School - Modular Classroom

12 Mar 2014 - The Martin High School - Modular Classroom

We are in the process of completing our second phase of enabling works at The Martin High School in Leicestershire. The enabling works includes piling, drainage, access and landscaping an area of approx 300m2 for the installation of Modular Classrooms. These buildings will then be clad in cedar, more photos to follow.

Sky Blues in the Community

11 Feb 2014 - Sky Blues in the Community

Zone CEE are proud to be assisiting in the sponsorship of Sky Blues in the Community, who run a number of football teams for people with a disability at Under 13, Under 16 and adult age groups.

The teams play in the Birmingham Ability Counts league, which have regular festivals taking place on Sundays throughout the football season.

For more information visit: http://www.sbitc.org/disability/disability-teams/

Birmigham Bursars Conference

09 Oct 2013 - Birmigham Bursars Conference

It was lovely to meet so many Bursars and School Business Managers at the Birmingham Bursars Conference yesterday.

The winner of our prize draw for the Large Chocolatier's Box from Hotel Chocolat is: Taran Kataria at Handsworth Wood Girls Academy

Synergy Fitness Centre - Sauna and Steam Room Extension

24 Sep 2013 - Synergy Fitness Centre - Sauna and Steam Room Extension

We created a new extension to house the new sauna and steam room at the Synergy Fitness Centre located at Calthorpe Specialist Sports College in Birmingham. The project also meant the creation of a new entrance, reception area and various internal alterations.

Langley School, Solihull - New Pupil Toilets

24 Sep 2013 - Langley School, Solihull - New Pupil Toilets

We worked on this project with Construction Management Services, where the brief was to refurbish 4 existing pupil toilets. The pupils chose colour schemes for each set of toilets. The walls were all clad in whiterock to ceiling height, with WC duct panels, cubicles and vanity unit in SGL from the Quantum range by Venesta Washrooms.

Calthorpe School - Medical Room

14 Aug 2013 - Calthorpe School - Medical Room

As part of the Summer refurbishment programme we refitted new units into the Medical Room at Calthorpe School.

Westminster Primary School - Staff Toilets

15 May 2013 - Westminster Primary School - Staff Toilets

We were delighted to work with Westminster Primary School, refurbishing the School Toilets. We began with the Staff Toilets, shown here. Using the Bushboard Sentinel range of cubicles and vanity units to maximise the space within these long narrow areas.

Percy Shurmer Academy - Conference Office

04 Feb 2013 - Percy Shurmer Academy - Conference Office

This was a design and build project to construct a new extension providing a conference facility incorporating full air conditioning, with aluminium bi-fold doors out to the lawn and a small meeting room.

Calthorpe School - New Entrance

04 Feb 2013 - Calthorpe School - New Entrance

We constructed a new entrance for the School in aluminium framed curtain wall glazing to form a secure reception area. The entrance incorporated a new DDA accessible ramp.

Percy Shurmer Academy - New Classrooms

29 Jan 2013 - Percy Shurmer Academy - New Classrooms

During this project we converted some of the rooms on the second floor from Dance and Theatre studios back into classrooms with additional teaching space consisting of break out rooms for small groups of students.

Hunters Hill Technical College - Redditch

29 Jan 2013 - Hunters Hill Technical College - Redditch

This project was undertaken in partnership with MADE Architecture Ltd, who designed this unique toilet layout. This enabled the security of the toilets to be maintained via the frameless glazed panelling, whilst offering privacy to the users by installing full height flush cubicles which were digitally printed using images from the Schools grounds.

Cotterhill Hitchman Solicitors - Sutton Coldfield

29 Jan 2013 - Cotterhill Hitchman Solicitors - Sutton Coldfield

We have just completed the fit out and refurbishment of a 400m2 office space for this prestigious legal practice. The colour scheme was developed by our Creative Director. We created new offices for each of the Partners along with several meeting rooms and breakout areas.

Little Monsters at Stechford Primary School

29 Jan 2013 - Little Monsters at Stechford Primary School

The infant boys chose Monsters as the screen print image for the doors to their toilet cubicles. The walls were panelled to 1.2m with Altro Whiterock wall panelling then decorated above in Ilumitex wall covering from Pittaways.

The cubicles and vanity unit are from the Genesis range by Venesta Washrooms.

This was one of 5 toilets we refurbished at Stechford Primary School.